Wellington Tunnel

November 15, 2012 - Wellington Tunnel, Griffintown (Montréal, QC)
Wellington Tunnel — Jen Reimer & Max Stein

The Wellington Tunnels were built in the 1930’s as a passage underneath the Lachine Canal in Montréal. The tunnels were closed for security reasons and abandoned in 1994.

The performance combined horn, field recordings, live electronics and 12 sound responsive incandescent light bulbs. The light bulbs spanned the length of the tunnel, lining the ceiling from the entrance to the back of the tunnel where two  speakers were situated.

 


Credits

Performance by Jen Reimer + Max Stein + Adam Basanta
Curated by StudioXX and Generator Montréal
Presented as part of HTMlles Festival 10 - 2012

Concept & Sound by Jen Reimer & Max Stein

Light by Adam Basanta

Photos by Thien V & Lenka Novak
Video captured by Lenka Novak, Edited by Jen Reimer
Sound captured by Julian Stein


Map
Video
Sound